May 7, 2026 OFFSHORE MOBILIZATION AND MODIFICATION WORKS

We worked simultaneously on multiple offshore installations on one ship, including a gripper system and
supporting deck equipment. The scope covered disassembly, modification, reassembly and inspection preparation.


Our activities included.

• Dismantling arms, clamps and sea fastening structures.

• Removing and replacing wear plates, strips and cassette components.

• Milling, drilling, welding and grinding of stainless steel and structural steel parts.

• Positioning, aligning and torqueing critical components.

• Preparing and supporting NDT inspections and repairing identified defects.

• Executing mechanical assembly and pin connections.

• Installing temporary access solutions and providing logistical support.

• Cleaning, preserving and preparing equipment for the next operational phase.

By deploying multiple teams in parallel, we maintained tight control over planning and ensured continuous

progress. This project highlights our ability to modify, maintain and prepare offshore equipment safely and

efficiently.

If you are working on offshore mobilization, maintenance or modification projects, we are ready to support you.